Hello and welcome to Part 2 of the project we started last weekend and continued this past weekend. On Thursday the Mountain Man took the truck to town to pick up the last 1000 pounds of gravel (total gravel purchase for the driveway and ditch - 30 tons or {I'll do the math for you} 60,000 pounds. So when you think about it in those terms, $700 seems pretty cheap.) and we finished the gravel that night. Here's a picture of the Queen shoveling gravel out of the truck and having a grand time.
Saturday The Mountain Man began construction on the flower bed and the "walls" of the path itself. I took the kids to a party at the park for lunch with a number of people, which allowed him to work undisturbed, since he had to crawl under the porch and get the latticework and baseboards put up in preparation for the flowerbed.
Once we got home, we were able to "help." The kids both LOVED pounding nails. The Queen, being a perfectionist, insisted every nail go all the way in. DeBoy was satisfied with a few taps and ready to move on to the next one. Getting nails into treated lumber is VERY hard, so the Mountain Man hit (smirk) upon the idea of letting them drive nails into some styrofoam insulation material leftover from the unfinished Great Porch Ceiling project that was part of the Great Building DeBoy a Room project of 2005.Ready for mulching and fill dirt.
The Yard Machine (that's the actual name of it) aka "The Beast." The Mountain Man dragged this out of the shed in preparation for reducing our
mountain of sticks that threatens to fall over onto the truck stick pile into mulch for the path. Only to be confronted with the reality of no gasoline. So since we needed fill dirt for the flower bed anyway, I went to town and picked up gasoline, went to Lowe's for 8 40-pound bags of soil which I loaded by myself, thank you very much, and 6 plants. I also went to the big store for dog food because they were completely out and looking longingly at the cats.
Once I got back, mulching began in earnest. Strider is testing out the first bag. For some reason he loves to sleep on mulch. Eight bags later, we had enough for the path. In the meantime, I set about dumping the dirt into the flower bed. If you ever do this, it may be good to put the dirt in the flower bed before you start putting mulch on the path. Just in case you accidentally tip the wheelbarrow over and dump a bunch of topsoil on your freshly mulched path. Not that I would know anything about that, of course.
Obviously, I have some spatial issues. I thought 3 mums would be enough. (The other 3 plants were hostas that went elsewhere in the garden.) This weekend we will be buying more plants, the last piece of lumber for the wall, and some decorative mulch.
This was my other project, an elf door. The door on the left is from Plow and Hearth. I made the one on the right out of polymer clay. I put my door on the tree next to my statue of St. Francis. . . . . What?

Thursday, August 21, 2008
The Ditch Project Becomes the Path Project
Wednesday, August 13, 2008
Ditch Digging 101
Building a house is a never-ending process. We made it livable, but there are still many picky little things to be done. For instance, the guest room has no baseboards. One piece of trim is missing from the dining room. These are things you stop noticing after awhile. Then very occasionally you look up and say, "Oh . . . right."
We have several "to-do" lists. I have a catch-all list with about 60 items on it. The Mountain Man has two: an inside list and an outside list. Each list has approximately 75 things on it. And only one item is on both his and my lists (tiling the wall over the stove). Although we are learning to be more specific so we can cross things off more quickly. For instance, instead of "stain decks" we put "stain front deck, stain back porch, stain upstairs deck." So while it adds items, it is much more encouraging, since some of these projects are more than you can do in a couple of hours, which is usually what we have available.
Anyway, we were inspired for one project by the fact that the Mountain Man's foundation guy was finally available to grade and put new gravel on our 1/4 mile long rut waterfall drain driveway. The Mountain Man asked him to bring extra gravel so we could put in some drains. $700 later (that's just the gravel, we don't know what we're looking at in labor. It took him a day and half - it was that bad), we still are looking at picking up another load of gravel in the truck. But at least we only have one trip to town for gravel as opposed to the six we would have had otherwise.
The project requiring all this gravel was digging a ditch behind the house so we can build a path to the "park" (backyard where the swingset is), rather than traipsing through the mud like we've been doing for the last several years. The ditch was required so we could put in drains so that when we do build the path, it won't end up being an elaborate and expensive mud path. Because what we have now is just a cheap accidental mud path requiring no effort on our part.
So Saturday morning bright and early (think 6:30) the Mountain Man started digging. And digging. And digging. He used a mattock to break up the dirt and rock - lots and lots of rock - that had been packed down over the last 8 years while we were building and living in the house. What he thought needed to be a 20-foot ditch turned out to be more like 35 feet. (That's why we ran out of gravel and pipe.)
The kids and I went out to help after they woke up. For August it was amazingly cool - in the 60s. At first the kids were content to sit in the chair and watch Daddy dig, but that got old pretty quickly. The Queen was all excited about dumping in gravel, but Daddy wasn't quite ready for gravel yet, so we spent some time collecting some gravel in odd leftover plant containers. She even used her purple plastic shovel to get some loose dirt out of the ditch. DeBoy was more interested in digging in the dirt. My sister-in-law had sent us home with some kid-size gardening implements and gloves, and the kids were all about using those, even though DeBoy's hands were so small his fingers didn't go into the glove fingers. But they collected the gravel in their buckets and they were very proud.
We discovered several earthworms that I picked up for them to touch (they didn't want to after the first one, and the Queen poked one with a shovel trying to get it to move, but I expect she poked a bit too hard, because when I moved it, it made no effort to go anywhere. We told her it was sleeping.). So several earthworms were introduced into the involuntary relocation program, although where they went has much better soil than where they were, so they should be grateful (unlike most such programs).
I snagged some of the bigger rocks the Mountain Man was digging up and started relining one of our paths through the garden, clearing away weeds and such in the meantime. I also planted some perennials that had been languishing away for a month in their pots. They seem to have survived the neglect. I like those kinds of plants.
On Sunday, we loaded up and went to town for the last piece of pipe, then the Mountain Man used up the last of the gravel, and we checked for drainage again. You'd be amazed how exciting drainage is when all the water is running the way it is supposed to. I guess you had to be there.
It started raining as he was moving some of the leftover dirt to build a ramp to the shed. We stayed out and played in the rain until the thunder started. Suldog should be proud of us.
The Mountain Man is planning to get the last load of gravel this week and we'll finish the drain part this weekend. Hopefully we'll also be able to build the flower bed, and maybe even start on the actual path. Rest assured that we will post pictures, whether you're interested or not.
Hey Daddy, I'm sitting in the chair like I'm supposed to! The Mountain man digging.
The first drainage test. (And the end of the first outfit of the day.)
The first layer (French drain) with gravel on top. The second solid drain on top of the French drain.
The gutter connects to the joint, the joint connects to the solid drain, the solid drain travels the ditch line . . . and it works. How do we know? Because you haul the hose up the ladder and pour water down the gutter.I seriously contemplated just throwing the pants away, but since they're designated for this sort of work anyway, they didn't have to come out completely clean. And all the mud-covered shoes and the rest of our mud-covered clothes had to be washed as well, so we did it. I even got the mud out of the pink dress. (Proud of me, JJ?)
to be continued . . .
Thursday, March 13, 2008
Thirteen for Thursday
This technically isn't a proper Thirteen for Thursday, since it's pictures, rather than a list. These are from our "BIG" snow last Saturday. It doesn't compare to what my family in Ohio got, but it was the most snow we've had all winter.
The first one is a bonus picture from Wednesday Feb 27. This redbelly has been with us about 3 years now. He brought home a wife last year, but she doesn't come to the feeder often. I took this photo - hubby took the rest.
DeBoy on his way to help the Queen clean the snow off her new "Big Girl" swing that we put up on the previous Sunday when it was 70.
"We could sweep this clear in half a year, if you don't mind the work." Lewis Carroll
"Whose woods these are, I think I know." Robert Frost
The first of many snow angels.
OK. Now get me a real sled, and get this fence out of my way. I can see that hill from here.
Never mind, I don't need a sled, and the driveway will be fine.
Yes, this is our driveway. It would be great for sledding, if only you could stop at the bottom and not go across the road into the ravine (which is why I don't take the car down the driveway when it snows).
Our
Looking across the river. Between the two bottom power lines you can get a glimpse of the clearcut mountain from the mountaintop removal post.
Posted by
Janet
at
9:50 AM
11
What Do You Say?
Labels: family, home, houses, kids, snow, Thirteen for Thursday
Tuesday, February 26, 2008
Page 123 Meme
Several folks have done this and it looked fun. Here are the rules:
1. Grab the nearest book.
2. Open the book to page 123.
3. Find the fifth sentence.
4. Post the text of the sentence in your journal along with these instructions.
5. Don't search around and look for the coolest book you can find. Do what's actually next to you.
Unfortunately, the nearest book to me is a Dr. Seuss book without the requisite number of pages, and my script is on my nightstand, also without enough pages (thank heavens). So I went to hubby's nightstand and found The Builder's Secret, by George Ehrenhaft, a book loaned to us by a friend which might have been useful when we started building the house 8 years ago. However, here's the fifth sentence on page 123.
"A whole crew from the BSO came to lift the north wall, a stick-built behemoth thirty-two feet long and fourteen feet high that Fenwick had framed with two-by-ten plates and two separate stud systems (two-by-four and two-by-six) for thermal separation."
Actually I think one of our walls was that big.
Edited to add: Turns out we did get it before we started building. We just didn't read it.
Posted by
Janet
at
9:43 AM
3
What Do You Say?




Snow cream!



